Trace at the source
Every significant claim is tied back to primary sources at the time of use, with retrieval details and context preserved in the project’s private working archive.
Research
Phase 1 is complete. The working design is a Starship-scale platform with laser comms and HD Earth video, backed by a source-captured research library. A first-pass power study is in: the power budget works if we fly cameras and skip the lasers for now. Flying both lasers wants a folding solar wing in the 250–350 W class. SpaceX has not published Mini Laser size, weight, or power, so we are not inventing those numbers. If the cameras look at Earth's surface, NOAA contact is the first paperwork gate. The FCC licenses radio, not lasers. Five-year disposal is already required. The printed smallsat track is not a schedule. After separation we own the bus. This mass class is built to fit ESPA, a common rideshare adapter ring. Public Starship power numbers stay unpublished. HD Earth video is a tenth-of-a-degree body-pointing problem. Public optical terminals do the fine pointing inside the head. A small thruster pack with about 50 m/s of push, one-newton class, is the first-pass close. Commands go over S-band (2025–2110 / 2200–2290 MHz) with a commercial ground network (KSAT Lite or Leaf), not a backyard dish first. The lasers are not the command path. The locked bus is quote-only. SpaceX's printed rideshare prices are for sun-synchronous orbits, not this 53° path. 53° / Bandwagon has no printed dollar. The Starship smallsat ticket is missing. 485 km is a congested band. We do not have a cited collision-avoidance rate for this shell. Nothing that closes a locked flight need is add-to-cart. A cheap garage bench exists; it does not close flight parts. The real flight parts still need a quote. Next is those quotes and a real conjunction run — not more architecture. High-level only — verify every conclusion against primary sources. Not a legal memo. Not an ICD. Not a bid.
Library
Every technical claim traces to a primary source captured at the time of use. The public library now covers the May 2026 architecture lock and the August 2026 first-pass power/thermal, regulatory, bus-interface, ADCS/propulsion, TT&C/ground, cost-floor, conjunctions, and first-hardware maps. Official public URLs only. Raw working archives stay internal.
Approach
Every significant claim is tied back to primary sources at the time of use, with retrieval details and context preserved in the project’s private working archive.
High-level summaries and methodology are published here. The complete working archive and detailed analysis remain internal to support ongoing work and future revisions.
When assumptions need to change — new laser data, different hosted interfaces, updated propulsion options — the original evidence remains organized and usable.
The complete working archive remains internal. The dedicated library page describes the major source categories and documentation process.